Wednesday, December 16, 2009

15 December 2009

Electrical cables and water pipeworks were layed
before installation of insulation batts scheduled
on the 18th of December.

Theatre power points & TV point.

Kitchen


Island bench


Garage with meter box.



Bath





Wednesday, December 9, 2009

09 December 2009

Bricks were completely layed today. But mess is all over
the place...inside and outside of the house.





Monday, December 7, 2009

07 December 2009

Our home is slowly taking shape: the roof was installed last week while
the external brick walls will be completely layed by the middle
of this week.

Fascade: Can't figure out yet how it looks like at this stage.




Roof: CSR Monier Elabana - Barramundi
Gutter: Colorband - Woodland Grey
Fascia: Colorband - Dune

Bricks: PGH - Chiara (surprise..surprise..the bricks look like
they came from different batches as we got several Chiara shades. The brickies
had to mix the bricks and play around with the different shades
so that it would appear like we have multi-coloured bricks).